David, Tommy, and Grandpa continued to work on the bathroom on Saturday, and then Tommy stayed and helped until about 3:00 on Sunday as well. After Mom and Tommy left David's mom joined us and we continued our mission to finish the bathroom renovation! Even though we stayed up working until 3:30am on Sunday/Monday morning we were unable to get the bathroom in working order for the week. Because my grandparents live just 20 minutes away this wasn't a big deal though, and we are staying with them until Saturday morning. Right now we have finished the tiling and plumbing for the shower/tub, we have drywall on all of the walls, and we have tiled the floor. Remaining tasks include grouting the floor, putting the toilet back in, doing the plumbing for the vanity, installing the vanity, installing a light, spackling and painting the walls, and installing a ceiling. Luckily most of these things are more "finishing work" and so by the end of Saturday we should have a functioning bathroom! Shown below is a photo of the finished shower/tub, and more pictures can be found by clicking on this link:
https://plus.google.com/photos/111337432367013111703/albums/5748429679097607105?authkey=CMHDhdGhuaD1KQ
No comments:
Post a Comment